Kick Tolerance – Well Control

12 Apr.,2023

 

Comparing BPP vs RPD in Drill Pipe Connections

MPD Simulator for iPhone and iPad

BPP is a auxiliary component of the MPD System to provide flow to maintain Back Pressure during low-flow events or pumps-off events, such as in drill pipe connections.

When the rig mud pump is being ramped down slowly for connection purposes, the back pressure pump is turned on and ramped up when the rig mud pump drops below a set point. Flow by choke varies causing greater pressure variations, requiring more attention from the operators.

RPD is a necessary component of the MPD System to maintain Back Pressure during drill pipe connections using the flow provided by the mud pumps of the rig. The flow by choke does not vary. Pressure variations are smaller.

For Oil & Gas apps for iPhone, iPad and Mac, please visit our websites at:

https://www.wellcontrol.com.br

Https://wellcontrol.blog

Did you like our content?

– Like it ❤️

– Follow Us!

– Share your experience with your friends!

Thanks

Simulations

For more information Heavy Weight Drill Pipe, please get in touch with us!